Requirement review
Part, sample, drawing, direction and acceptance criteria are checked before production.
Inspection starts from the buyer's reference, sample or drawing and the characteristics agreed for that order.
Part, sample, drawing, direction and acceptance criteria are checked before production.
Critical characteristics and comparison methods are captured for the order.
Frequency, equipment and responsibility follow the approved control plan.
Quantity, appearance, traceability and packing are confirmed before dispatch.
Approved sample or drawing, inspection points, measurement method, sample record, packing standard, traceability requirement and nonconformance handling.